Another weekend closer to departure ticks by. This weekend I needed to change the ally angle that was supporting the steering cables for thicker mild steel, and also fitting the wood to the swim platform.
The mild steel angle fitted up amazingly quickly (for a boat job anyway), so it was time to crack on with the swim platform. We re-bolted the steel supports and sealed everything with a touch of 5200, then fitted the hardwood planking.
A light trim later and I'm relatively happy with it, although it'll need another trim as it's too wide.
After that, I had a spare day so fitted the cover to the guest cabin mattress.
Doesn't seem like much got achieved, but it filled up the weekend quite easily. Anyway, it's the last week at work before the holidays then I've two weeks off to get more boat work done. It never ends.
5 1/4 months to go.
0 comments:
Post a Comment